VALUE4REAL

Raben Group Hungary


Area:
5000 m2

Service:
Design & Build, Project Management

Client:
Raben Group Hungary

Location:
Dunaharaszti

In 2022, the need arose to expand the warehouse capacity and establish a new central office building at the Raben Group Hungary headquarters in Dunaharaszti. According to the concept, the new warehouse is connected to an already existing facility, creating a combined multifunctional warehouse with a total floor area of more than 7,000 m². The larger interior space simplifies material handling, while the total of 70 loading docks allows the reception of all types of vehicles—from vans to full-size articulated trucks. One of the unique features of the building is a separately controlled temperature chamber (box-in-box), suitable for the safe temporary storage of goods requiring cooling or heating.

Alongside the warehouse, a new two-story office building was constructed, housing open-plan offices, meeting rooms, and a canteen. The 3,400 m² warehouse, built from prefabricated concrete elements, together with the adjoining 1,000 m² office building, was realized under a Design & Build contract over nearly 1.5 years through the coordinated efforts of Value 4 Real Group’s three divisions (Architectural Design, Construction, and Project Management), from concept design to handover.

The approximately €7.5 million investment has resulted in a new cross-dock hub that enables the logistics company to handle its significantly increasing freight volumes, while also tapping into the growth potential of both domestic and international groupage transport.

Sustainability and the reduction of the Group’s ecological footprint were primary considerations during the expansion. As part of Raben Group’s comprehensive decarbonization strategy, all new facilities are implemented to standards above the industry average. The new Dunaharaszti cross-dock warehouse is equipped with energy-efficient, digitally addressable (DALI) LED lighting. The entire site’s energy consumption can be monitored through smart metering. Energy efficiency is further enhanced by passive solutions such as effective insulation and shading.

The approximately 1,000 m² new office section is equipped with a heat pump-based heating and cooling system, controlled via a central building management system. A significant part of the building’s electricity supply is provided by a rooftop solar power system with a peak capacity of 335 kWp. According to current company estimates, with the new facility the Group now has sufficient cross-dock capacity to keep pace with the expected growth in freight traffic over the next five years.

More images:

Hungary

BEM CENTER, Wing A, 6th Floor
1027 Budapest, Bem József 1/B.
Phone: +36 1 201 1249
E-mail: info@value4real.com

Poland

Graniczna 51E,
09-407 Płock, Poland

E-mail: poland@value4real.com

Social Media


©2025 VALUE4REAL. All rights reserved. Privacy Policy

WebDesign: Hlinka Zsolt